◐ 4 Sediment handling corruption measures related to river restoration project ◐
Currently four ongoing river restoration project in the government during dredging operations at General aggregates (sand, gravel) can be used, but it is most often judged by some sectors that the extreme part of or contamination in estuaries (eg, cod Kumho) decayed Discussions are expected to cause sedimentation
These deposits will not be used as an aggregate, as well as the long-term storage and is expected to occur at the stench of waste disposal ground is not easy relationship promote all four river restoration project is expected to be an obstacle.(Some water with clay, the same phenomenon Chidori) Accordingly, we find a solution, such as attachment materials were.
HanRiver
NakdongRiver
GeumRiver
YeongsanRiver
Aggregate
Junseolryang
5,000
44,000
3,000
57,000
Using aggregate
4,950
43,560
2,970
56,430
Corruption, red soil retired
50
440
30
570※)
4 Guidelines for Project Quantity to secure promotion, is to install a Submerged Weir. Over time, the sediment builds up again, and soon deteriorated water quality issue is expected to appear.
To solve this problem, we use a small Dredge Equipment Slurry separator system for regular dredging operations and the water quality deterioration can be prevented by management and improvement of water quality is expected.